Ferreira do Alentejo

CPV Energia 2

(2012 to Present)

The CPV (Concentrating Photo-Voltaic) Energia 2 is starting construction and will be connected to the Electrical Grid during 2014.

  • 1st phase - February 2014
  • 2nd phase - May 2014
  • 3rd phase - July 2014
  • 4th phase - September 2014
  • 5th phase - December 2014

 

Features

  • located in Ferreira do Alentejo; Phase 1 (1MW) connection to the Electrical Grid in Q2 in 2014.

Technical Data

  • 330 (2-axis) trackers with an installed total capacity of up to 5MW.